Road of HBC

The first stage

1954-1960

The second stage

1961-1980

The third stage

1981-2000

The fourth stage

2001-2014

The fifth stage

2015-presen

Learn from the Soviet Union and lay a good foundation

Right after the founding of the HBC, with the help by the former Soviet Union, HBC established a comparatively complete technology and management system. Based on the absorption of the former Soviet Union’s technology, we developed series domestic medium-pressure products of different grades with different furnace types, which adapt to a variety of fuels and developed auxiliary equipment for the 25,000 tons/y synthetic ammonia project, which put an end to China’s history of not being able to manufacture power station boilers and pressure vessels. During this period, we developed successfully the first domestically made 230t/h and 410t/h high-pressure boilers, and our country began to enter a new era for high-pressure boiler production.

Year 1954
Commencement ceremony
Year 1954
Ground-breaking
Year 1954
Ouyang Qin, the first Secretary of the Heilongjiang Provincial Party Committee of the Communist Party of China, cut the ribbon for the start of the HBC project.
Year 1957
4-roller plate rolling machine
Year 1957
The first domestically made 35t/h medium-pressure boiler, installed in Yunnan Kaiyuan Power Plant
Year 1957
The state-level acceptance check and signing ceremony
Year 1960
The first domestically made 410t/h high-pressure power station boiler, installed in Gaojing Power Plant
Year 1960
The first domestically made 410t/h high-pressure power station boiler, installed in Gaojing Power Plant in 1960

Self-reliance and hard work

The experts of the former Soviet Union began and continued to evacuate from HBC in 1960. The people of HBC shouldered the heavy responsibility of the development of China's equipment manufacturing industry with our strong backbones resolutely and opened the road towards self-reliance and hard work with our great patriotism and ambition to serve the country. The first domestically made ultra-high pressure 670t/h boiler was developed by us, which became a product among a series of boilers, indicating a leap forward from high pressure boilers to super-high pressure boilers.

Year 1969
Automatic production line for serpentine tube of economizer
Year 1969
The automatic 7-head submerged arc welding machine of membrane water wall
Year 1970
The first domestically made 670t/h lignite-fired ultra-high pressure boiler, installed in Chaoyang Power Plant
Year 1973
Vertical panel bending machine
Year 1975
The 9-meter vertical lathe made by HBC on our own
Year 1979
The first domestically made 670t/h anthracite ultra-high pressure boiler, installed in Jiaozuo Power Plant

Introduction of technology, optimization and innovation

The spring breeze of reform and opening-up brought new development opportunities to HBC. In order to improve our international competitiveness, HBC cooperated with foreign companies and introduced their knowhow. We introduced subcritical boiler technology in 1980, introduced medium-size and small-size CFB boiler technology.in 1999. We independently developed 300MW subcritical natural circulation boiler, resulting in upgrading and transformation from 100MW and 200MW boilers, as the main products, to 300MW and 600MW boilers, as the main products. In 1994, HBC carried out shareholding system reorganization, shifting from a factory based system to a company system, and gradually realized internationalization of technology and management systems.

Year 1982
Trainee group photo in CE Inc. of USA
Year 1985
Li Peng, the then Vice Premier of the State Council, inspected Pingwei Power Plant, and he wrote the inscription “Pingwei, an extraordinary place, equipped with a top-capacity machine set in China.”
Year 1989
The first domestically made 600MW subcritical boiler, installed in Pingwei Power Plant, Anhui Province
Year 1989
The first MPM membrane water wall production line introduced to China
Year 1989
The first domestic system pipe bending production line independently designed and manufactured by our own
Year 1989
The 8000 ton oil press, which is the largest in Asia
Year 2000
The first domestic narrow-gap submerged arc welding machine jointly developed
Year 2004
The hot wire TIG welding introduced by us, the earliest introduction in this industry in China

Internationalization and rapid development

With the reform of electric power system of this country, a new rapid development period came to the electric power industry. HBC seized the opportunity and successively introduced supercritical and ultra-supercritical boilers, and high-capacity CFB and other technologies, realized full-scale integration with the world, and started a new journey of rapid development. At the same time, we carried out the strategy of development driven by innovation and improved the route for technical development, made progress towards of independent R&D and innovation on original technologies. We successively developed large-scale CFB, supercritical and high-efficiency ultra-supercritical boilers and other internationally leading products. The ability of HBC in innovation and R&D of boilers has reached the international advanced level.

Year 2006
The first domestically made 1000MW ultra-supercritical boiler, installed in Yuhuan Power Plant, Zhejiang Province
Year 2006
The first domestically made 300MW CFB boiler, installed in Kaiyuan Power Plant, Yunnan Province
Year 2007
The first domestically made 600MW ultra-supercritical boiler, installed in Yingkou Power Plant, Liaoning Province
Year 2008
The first domestically made 350MW supercritical boiler, installed in Huaneng Ruijin Power Plant
Year 2009
The first domestically made 660MW supercritical fan-mill tower-type boiler, installed in Jiutai Power Plant, Jilin Province
Year 2010
The first domestically made 660MW supercritical boiler for export, installed in Mundra Power Plant in India
Year 2014
The first domestically made 660MW high-efficiency ultra-supercritical boiler, installed in Huaneng Changxing Power Plant

Transformation, upgrading and high-quality development

The green development has become the key word of development of the electric power industry. HBC made a right prediction ahead of time and actively promoted the study on high-efficiency clean coal-burning technology. The company successively developed double reheat boilers for Anyuan and Laiwu power plants, opening up the new era for double reheat coal-fired generator sets in China. Focus was put on the future development direction for power station boilers, to accelerate the pace of research on power station boilers with 630℃, 650℃, 700℃ and higher temperatures. At the same time, with the supply-side structural reform as the main guideline and with high-quality development as the goal, we will accelerate the pace of transformation and upgrading, promote the transformation and innovation of enterprise operation mode, and open up a new path for the high-quality development of power station boilers.

Year 2012
The 350MW supercritical Zhundong coal-fired boiler, installed in the self-supply power plant of new and special energy of TBEA Co.
Year 2014
The first domestically made 660MW ultra-supercritical double reheat boiler, installed in Huaneng Anyuan Power Plant
Year 2015
The 1000MW ultra-supercritical double reheat boiler, with the highest parameters in the world, installed in Huaneng Laiwu Power Plant
Year 2016
The 1000MW high-efficiency ultra-supercritical boiler, installed in Datang Sanmenxia Power Plant
Year 2017
The 350MW supercritical CFB boiler, installed in Yanggao Power Plant, Datong Coal Mine Group
Year 2018
The 660MW ultra-supercritical coal-fired boiler with Zhundong coal as the only fuel, installed in Zhundong Tebian Beiyi Power Plant
Year 2019
The world first 660MW ultra-supercritical CFB project, listed as one of the first batch of national demonstration projects